Before we arrive on site, we need several documents from you.
Scale site plans.
Drawings showing boundaries, structures, service locations, and areas marked for clearance.Service drawings.
Gas, water, electric, fibre. Every underground line. If plans are missing or incomplete, services must be located and a safe method agreed before grinding or excavation in the affected area.Ecology reports.
Bat surveys, great crested newt surveys, breeding bird surveys. They dictate what we can and can’t do, and when.TPO or Conservation Area documents.
Working on a protected tree without consent is a criminal offence. We can’t do it.Your programme dates.
When does the groundworks crew start? We schedule backwards from that date.← Site clearance for construction | All common questions →